- Overview
- Detailed Photos
- Product Description
- Company Profile
- Production Flow
- Ehxibition&Certification
- FAQ
Basic Info.
Model NO.
A2-218
Lock
Without Lock
Installation Type
Surface Installation
Surface Treatment
Galvanized
Color
Antique Brass
Usage
Door, Furniture
Customized
Customized
Salty Spray Test
72 Hours
Delivery Time
30days After Deposit
Terms of Payment
30% Deposit and 70% Before Shipment
Accessories
Connecting Screws/Wrench/Fixing Screws
Transport Package
1 Set/Box
Specification
Spindle Size: 8*8cm
Trademark
Vaisite/Customized
Origin
Wenzhou, China
HS Code
8302410000
Production Capacity
100, 000 Pieces Per Month
Product Description
Type | Zinc Alloy Door Handle With Vintage Design |
Model Number | A2-218 |
Material | Zinc Alloy |
Production Process | Mould,Die-casting,Punching,Machinery Processing,Polishing, Polishing Inspection,Electroplating,Electroplating Inspection,Assembling, Assembling Inspection,Packaging |
Finish | Antique Brass,Chrome,Silver,PVD,etc |
Application | Main Door, Metal Door, Security Door, Outside Door,etc |
Spindle Whole | 8x8mm |
Package | White box |
Standard Configuration | Pair of handles, spindle, necessary screws, wrenches |
OEM,ODM | Accepted |
Place of Origin | Wenzhou, China |
Sample | Available |
Production Capacity | 100,000 Pairs/per month |
Delivery Port | Ningbo/Shanghai |
MOQ | 500pcs |
Payment | 30% of deposit,70% before shipment |
Warranty | 5 years |
Salty Spray Test | 72 Hours |
Installation Type | Surface Installation |
HS Code | 8302410000 |
Advantages | 1.Professional door handle production experience for more than 10 years. 2.Strong R&D and QC team,will provide innovative design and stable&high quality products. |
Q: Can you do OEM and ODM?
A: Yes, OEM and ODM are both acceptable. The material, finish, design can be customized, the mold freight is up to the design.
Q: What about the lead time of mass production?
A: It will usually take around 30days, depending on the order quantity. But we will try our best to finish all the goods as soon as possible.
Q: How about the payment?
A: 30% deposit to arrange the production and 70% before the shipment.